OUTKOM Catalyst Adam Starr EN/FR

I build and hold companies that bring technology into construction.

And I advise both sides of the adoption problem.

How it works

A studio model. A few companies, held for years, worked from the inside.

THE COMMERCIALIZATION GAP TECHNOLOGY built and funded, not yet bought most technology stalls here INDUSTRY fragmented, capacity-bound technology that isn't selling a first pilot, then adoption OUTKOM CATALYST translate · de-risk · pilot · place TECHNOLOGY built and funded, not yet bought technology that isn't selling THE COMMERCIALIZATION GAP most technology stalls here OUTKOM CATALYST translate · de-risk · pilot · place a first pilot, then adoption INDUSTRY fragmented, capacity-bound
Technology and industry do not meet on their own.The route across is the work.

I work both ends of this gap from the inside. On the industry side I advise, and I build instruments that listen. On the technology side I hold equity and carry an operating seat — I am accountable for the sale, not observing it. And on both sides I go to events and have conversations, which is how I hear each side describe the problem when the other isn't in the room.

Being inside both is what makes the translation possible.

I build and hold

An operating seat and a stake, not a retainer and a report. Some I start; some I join early. Either way I am inside the company, accountable for an outcome.

I advise the industry

Contractors, owners and public bodies deciding what to adopt, in what order, and what to leave alone.

Why this

Construction technology works.Adoption doesn't.

OWNER decides what gets built GENERAL CONTRACTOR decides the schedule SPECIALTY SUBCONTRACTORS decide the hours and the tools sets the budget sets the schedule EVALUATING NEW TECHNOLOGY by an innovation mandate — rare, or by whoever bumps into it OWNER decides what gets built sets the budget GENERAL CONTRACTOR decides the schedule sets the schedule SPECIALTY SUBCONTRACTORS decide the hours and the tools EVALUATING NEW TECHNOLOGY by an innovation mandate — rare, or by whoever bumps into it
Adoption is decided firm by firm, and rarely by anyone whose job it is. Getting a first project to pilot is the step everything after depends on, and the hardest one to reach.

The further down that chain you go, the harder it is to get anything adopted. By the time you reach the specialty trades — the firms doing most of the hours — you are talking to the smallest businesses, the most capacity-constrained, and the least sold to.

That stage decides what the rest is worth. Most progress upstream — in design, in financing, in prefabrication — lands on the work that starts once the envelope closes: sequential, headcount-heavy, and spread across the most fragmented part of the industry. Until technology commercially breaks through there, the gains upstream stay bottlenecked. It is also part of what gets called a labour shortage.

I have spent thirty years between the two: industries that have to change, and the technologies built to change them. The translation between them is hard. I did not set out to be the person in the middle — that is what I became.

The portfolio

What I build, hold and advise.

Equity · Launching

Vendor Voice

Evening the playing field between who hires and who gets hired.

Subcontractors and suppliers rate their contractors. Eleven questions, moderated, published as medians. What vendors always knew, written down.

Vendor Voice →
Equity · Operating role

TKF · Hydropod XL

Making multifamily housing affordable to build, own and operate.

HVAC and hot water in one factory-built pod, installed outside the building in a day. Eighteen pods in the field, 35% measured savings, nobody displaced.

TKF · Hydropod XL →
Equity

Rathco / OVR-VU

Energy intelligence, independence and resilience for the people who own buildings.

Software deciding which energy system a building should get. Deciding and installing are two halves of one transition.

Rathco / OVR-VU →
In development

A robotics and prefabrication demonstration centre

Putting scaling technology within reach of the industry’s most fragmented part — where the capacity bottleneck is.

Contractors see automation, prefabrication and work-assist equipment under real conditions; apprentices certify on it. Behind it: 43 screened suppliers.

Active engagement

An AI adoption program

Making firms in a fragmented industry more efficient, more productive, and better at what they build.

A mid-size Quebec general contractor, from tools landscape through deployment decisions.

Owned · Launching

540 · Deck Sprint

Staying in the flow where construction’s next technologies start.

A pitch deck read cold for deep, hard and climate-tech founders: six dimensions scored within 48 hours, a 45-minute mentor session, then a re-evaluation of the revision.

540 · Deck Sprint →

Get in touch

Let’s start with the problem itself.

Weighing a technology decision?

Send me the decision you're weighing. I'll tell you what I think, and whether I'm the right person to help.

Building something for this industry?

Tell me where it keeps stalling. I'll tell you how it reads from the buyer's side.

adamstarr@outkomcatalyst.com